After much ado about a lot, my kitchen almost existed and was almost no longer a figment of my imagination. I say almost because the dishwasher, range hood, sink and disposal would arrive and get installed in a few days. The finished product looks better than I could have ever imagined!
In a mere 4 weeks since closing on the house, we:
- Gutted the kitchen down to studs and sub floor
- Tore down the wall between the kitchen and dining room, effectively creating an eat in kitchen
- Installed doggy door for our Beagle so she can come and go as she pleases
- Dry walled ceiling we messed up when tearing down old wall, and leveling areas that once had a wall between them.
- Installed new floor in an attempt to match 80 year old wood floor in kitchen
- Ripped out three rooms worth of 1936 paneling from the master suite
- Re insulated the master suite
- Installed almost all the drywall in the master suite
- Took over a week to move 2 households into 2 storage units
- Sanded, stained, varnished kitchen floor, in addition developed allergic bumps to either floor stain or varnish
- Bought kitchen appliances
- Installed 75% of the kitchen cabinets
Yet to do:
- Finish mudding drywall seams in master suite
- Build storage cubbies to hold all our stuff
- Carpet master suite
- Refinish balance of first floor hardwood floors
- Move all of our stuff from storage units into house
- Install some sort of closet system in dressing room
- Install return and registers for kitchen and upstairs
- Paint - EVERY ROOM
- Have driveway poured
- IMPORTANT NOTE: By the time you get to this finished product, (photographed almost a year after purchase) we'd painted the kitchen walls three different times:
- first a blue gray (a la Pottery Barn)
- Palm Green (a la the den color)
- The inside of an avocado (ceiling and walls) - final color